US COAST GUARD STATION MONTEREY FLOATING DOCK REPAIR

  • Completed Gangway
  • Hoisting Gangway
  • Gangway III
  • Client: US Coast Guard
  • Location: Monterey, CA
  • Date: 2016
  • Contract #: HSCG88-15-J-PQQ155
  • Value: $64,623

Cerrudo Services provided all labor, materials and equipment to repair the existing floating waterfront dock at Station Monterey.  Repairs were required due to extensive damage caused over time.  The gangway was removed to the platform brow connection and a new welded connection was provided.  Weld repairs were made to the lower ramp connection.  The gangway wheels were replaced to allow pivoting in all directions.  The gangway wheel plate was replaced at the floating dock deck.  Cerrudo repaired the damaged concrete on the deck that had been damaged by the immobilized wheels.  Floating dock access was maintained for Coast Guard use during the repairs.

Cerrudo retained an approved environmental monitor to survey the marine mammal population before work began as well as during performance of the work. A report was provided on the mammal’s population and interaction with the work crews during construction.